Difference between revisions of "Hardware: PCB Assembly"

From HiveTool
Jump to: navigation, search
(Board Layout)
(Install male headers)
Line 68: Line 68:
  
 
===Install male headers===
 
===Install male headers===
 +
'''Required'''
 
# H8 1x4 and H9 1x6 for the HX711 board.
 
# H8 1x4 and H9 1x6 for the HX711 board.
 +
'''Optional'''
 
# H4 1x4 for console serial port
 
# H4 1x4 for console serial port
 +
# H2 1x5 for I2C
 +
# H6 1x5 for spare GPIO
 +
# H7 1x7 for I2s
 +
# 4 1x2 for 12 V power supply option 1.
  
 
<gallery mode=packed heights=200px>
 
<gallery mode=packed heights=200px>

Revision as of 05:02, 26 January 2016

Dev Kit PCB installed on a Pi 2.

Parts

Parts List

Mechanical Drawing for RJ connectors.

Board Layout


Assembly

Install 40 pin header

1. Insert the 2x20 female header from the bottom side of the board.

2. Solder the header on the top (component, silk screen) side of the board.

Install the resistors

Number Value (Ohms) Purpose
R1 330 Controls brightness of LED
R2 200K 12 V monitoring voltage divider
R3 1K 12 V monitoring voltage divider
R4 2.2K 12 V monitoring Reference voltage divider
R5 2.2K 12 V monitoring Reference voltage divider
R6 1K Rain gauge input filter

Install male headers

Required

  1. H8 1x4 and H9 1x6 for the HX711 board.

Optional

  1. H4 1x4 for console serial port
  2. H2 1x5 for I2C
  3. H6 1x5 for spare GPIO
  4. H7 1x7 for I2s
  5. 4 1x2 for 12 V power supply option 1.

Install RJ1 and RJ2

Be very careful to check that all the leads are in the holes before you snap it in

  1. Insert the 1x4 and 1x6 female headers on the make headers.
  2. Install the HX711 board on the 1x4 and 1x6 female headers.
  3. Install LED D1.
  4. Install C1 4.7 mfd. Observe polarity.
  5. Install C3 .1 mfd. for rain gauge filter.
  6. Install 12 VDC power supply if used. See below for option 1 or 2.

Power Supply 1

  1. Install four 1x2 male headers.
  2. Install blue screw terminal block.
  3. Install four 1x2 female headers on the four 1x2 male headers.
  4. Install the Power Supply board on the four 1x2 female headers.

power Supply 2

  1. Install Fulree voltage regulator
  2. Install green spring terminal block.

Testing

If using Power Supply Option 1, the voltage must be adjusted to 5.o to 5.1 volts before connecting to the Pi or HX711 board.